Solar energy storage battery solutions for homes, businesses and industrial projects

Construction: 🏗️Powering Construction Sites with ST Batteries

Construction: 🏗️Powering Construction Sites with ST Batteries

 

Why Construction Needs a Smarter Power Source

🛠️ Run Tools, Trailers, HVAC & Lighting

ST Batteries provides stable 110V/220V AC power via multiple NEMA outlets. It perfectly supports simultaneous operation of drills, circular saws, air compressors, trailer HVAC systems, and high-brightness lighting—no power fluctuations to disrupt work.

🚧 Built for Remote Job Sites

Equipped with all-terrain casters and forklift-compatible slots, ST Batteries power units easily access remote or rough-terrain job sites. No need for fuel deliveries or special handling—just place, plug in, and start powering.

🧰 All-Day Runtime with Zero Refueling

Powered by high-capacity 120 kWh lithium-ion batteries and 20 kW pure sine wave inverters, ST Batteries runs continuously for 10–16 hours without downtime. It’s completely silent, emission-free, and requires no oil changes or fuel storage.

🌍 Lower Job Costs and Environmental Impact

💸 Cut Fuel and Maintenance Expenses

Eliminate costs for fuel procurement, transportation, and engine maintenance. ST Batteries reduces long-term job site power expenses by up to 70% compared to traditional generators.

🌱 Zero Emissions, Quiet Operation

Ideal for urban construction sites and eco-focused contractors. No exhaust fumes, no noise pollution (avoids noise complaints), and no need for complex emission permits—simplify compliance with local environmental rules.

⚙️ What Construction Gear It Powers 

🛠️ Power Tools & Heavy Equipment

  • Table saws, concrete mixers, air compressors
  • Welders, scissor lifts, battery-powered forklifts

🏕️ Job Trailers & Temporary Structures

  • HVAC systems, lighting, refrigerators, office laptops, network routers
  • On-site offices, break trailers, and material storage facility utilities

💡 High-Intensity Lighting

  • LED tower lights for large-area illumination
  • Emergency night shifts or winter low-light operations

🔋 EV Equipment Charging

  • Battery-powered lifts, excavators, and construction trucks
  • Built-in CCS1 15kW EV charging port for fast equipment recharging

                   

🔌 How to Charge ST Batteries On-Site

⚡ Grid Plug-In

240V 50A NEMA SS2-50P input port. Charge at headquarters, warehouses, or job site trailers—full charge in 3.5–5 hours.

☀️ Solar Charging

Compatible with on-site rooftop or ground-mounted solar arrays. Supports up to 16kW input via dual 180A Anderson connectors. Full recharge via solar in approximately 5.5–7 hours.

🔋 Generator Support

If grid and solar are unavailable, ST Batteries accepts 6–12kW gas or diesel generator input—full charge in 5–8 hours.

⚡ Combine All Sources

Need rapid recharging? Combine solar + grid + generator to charge ST Batteries from 10% to 95% in just 2 hours.

🚧 Key Construction Problems Solved by ST Batteries

  • Fuel Supply Issues: Skip frequent fuel deliveries, reduce fire/flammability risks from on-site fuel storage.
  • Noise Restrictions: Operate smoothly in residential areas or urban centers without exceeding noise limits.
  • Jobsite Setup Time: No need for emission permits or waiting for grid connection—start using immediately after placement.
  • Equipment Clutter: ST Batteries integrates power storage and mobility in one unit, reducing on-site equipment redundancy.
  • Emissions Regulations: Meets Tier 4 and global zero-emission job site requirements, avoiding compliance penalties.

📊 How ST Batteries Compares to Jobsite Generators

Feature ST Batteries Diesel Generator
Power Output 20kW Pure Sine Wave 5–20kW (Varies)
Runtime 10–16 hrs (120 kWh) 6–8 hrs (10–20 gal)
Charging Options Grid, Solar, Generator Fuel Only
Emissions Zero CO₂, NOx, Particulates
Noise Silent 70–90 dB
Maintenance None High (oil changes, filter replacements)
Fuel Cost (Weekly) $0 $150–$400

🏢ABOUT US:

Back to News